ON SCREEN ROLE(MALE): Support the leading roles, no need to deliver a dialogue, running, fighting.
SCHEDULE:
SEPTEMBER. 17. 2016 06:30 am to 10:30am.
SEPTEMBER. 18. 2016. 06:30 am to. 10:30 am
SEPTEMBER. 24. 2016. time Same as above
SEPTEMBER. 25. 2016. time same as above
OFF SCREEN ROLE: assisting the director, & camera man
SHOOTING SCHEDULE:
SEPTEMBER. 17. 2016 06:30 am to 10:30am
SEPTEMBER. 18. 2016. 06:30 am to. 10:30 am
SEPTEMBER. 24. 2016. time Same as above
SEPTEMBER. 25. 2016. time same as above
October. 1. 2016. Time. Same as above
All rights reserved. The materials (trademarks, videos, images and text) contained on this site are the property of their respective owners. It is forbidden to use any materials from this site without prior agreement with their owner. When copying text and graphic materials (videos, images, text, screenshots of pages) from this site, an active link to the site www.acmodasi.in must necessarily accompany such material. We are not responsible for any information posted on this site by third parties.