TATTIWIN

ADR PRODUCTION
TATTIWIN (2025)
Timing: 0:52 (52 min)
TATTIWIN - TMDB rating
0/10
0
Release date
2025-07-21
Country
Production
Genre
Documentary
Budget
$47 000
Revenue
$51 000
Director
Scenario
Producer
Operator
Composer
Artist
Audition
Editing
The film tells the story of the creation of the first hydroelectric power stations in Morocco — Flilou and Sidi Saïd — which were built by the French company Penarroya to supply electricity to the Ahouli mines. The goal was to facilitate drilling operations for the extraction of lead ore. It also highlights the village of Tattiwine, located about 12 kilometers from Midelt, which served as the main water source for the Flilou station. Additionally, it covers the Sidi Saïd power station, which was supplied with water by a nearby dam to generate electricity.
Did you like the film?

© ACMODASI, 2010-2026

All rights reserved.
The materials (trademarks, videos, images and text) contained on this site are the property of their respective owners. It is forbidden to use any materials from this site without prior agreement with their owner.
When copying text and graphic materials (videos, images, text, screenshots of pages) from this site, an active link to the site www.acmodasi.in must necessarily accompany such material.
We are not responsible for any information posted on this site by third parties.